The hard part was never the permits. It was everything around them.
A permit expediter sells knowledge. Which form, which county, which portal, which inspector wants what. Marcia has that in her head. What she did not have was the time to use it, because most of a working day went to the paperwork wrapped around the knowledge.
The forms were the biggest drain. Every application meant opening a government PDF and typing the owner, the folio number, the legal description and the contractor details into it, one field at a time. Early on she told us this was the part of the job eating the most of her time.
- Government forms filled in by hand, field by field
- A billing log in Excel, with a new tab every month
- A permit tracking sheet she kept current herself
- A bookmark bar of building department portals. Miami-Dade alone has around eight, by her count
- Contractor license, insurance and business tax dates to remember and re-check
She wasn't short on skill. She was short on hours.
We watched her work before we built anything.
We started with two long calls and a screen share of her real spreadsheets, not a feature wish list. We looked at how a job moves from a contractor's phone call to a recorded Notice of Commencement, and where the hours disappear on the way.
Then we built around her process, not ours. Her invoice numbers stay exactly as she writes them today: client number, project number, invoice number. Her forms stay the real county forms. Her approval stays the last step, every time. The system does the typing. She stays the expert.
One place for the forms, the jobs and the links.
- Ready for reviewEvery form waits here for her approval before it can be downloaded.
- License watchA banner warns her before contractor licenses expire.
- Money on the streetOpen invoices and anything overdue, at a glance.
Upload a county form once
She adds a county's PDF form, maps its fields one time, and it stays mapped until the county revises the form. No limit on how many forms or municipalities.
The records fill the form
Owner, folio and legal description come from the county property appraiser for five counties, and contractor license details come from the state. Every filled field shows where it came from.
Nothing leaves until she says so
Required fields are enforced and a form cannot be downloaded until it is complete and approved. The speed never costs her the final check.
Every portal, inside the dashboard
Each municipality holds its own list of portal links, however many it needs, and a general list covers the rest. Each job's page shows the right buttons, one click away.
Her tracking sheet, retired
Jobs, permits and contractors live in one tracking view, with warnings before a contractor's license, insurance or business tax receipt expires.
Invoices and proposals in her format
Invoices follow her own numbering and price book, with card and bank payment links. Proposal scopes are drafted from her own past proposals, then edited by her.
What an hour or two used to look like, now.
Here is the path a single application takes through the system. It replaces opening a county site, hunting for the right form, copying records across by hand and zipping the finished pieces together to send.
Search the property
Pick the county, enter the address or folio number.
Records fill the form
Owner, folio and legal description land in the right fields, each tagged with its source.
She reviews and approves
Missing fields are flagged. Nothing is released until she approves it.
One download
Every approved form, plus the county-recorded Notice of Commencement, in a single file.
Marcia tells us that preparing an application, which used to take her an hour or two, now takes about five minutes.